Ineos Says Forties Oil Pipeline Repair Timeframe Unchanged | Gulf Coast Oil Rig Equipment & Repair
The timeframe to repair Britain's Forties crude oil pipeline in the North Sea remains 2-4 weeks.
The system, which carries around 450,000 barrels per day of Forties crude to Britain, along with a third of the UK's total offshore natural gas output, has been closed since Dec. 11 after a crack was found.
"There's a number of options that we're pursuing," Ineos spokesman Richard Longden said. "The timescale stays the same - two to four weeks from the 11th."
(Reporting by Alex Lawler, editing by Louise Heavens)